護坡樁在工程中的應用是怎樣的呢?實際上山東護坡樁在進行時,放線用測量儀器準確定軸線和樁位位置,護坡樁施工過程中,確定樁底、樁頂標高,施工時比樁頂高30~50cm。采用深層護坡樁層護坡樁機三次下沉切土,二次提升攪拌噴漿成樁的施工工藝方法。施工技術要求:
What is the application of slope protection piles in engineering? In fact, during the construction of Shandong slope protection piles, measuring instruments are used to accurately determine the axis and pile position. During the construction of slope protection piles, the elevation of the pile bottom and pile top is determined, which is 30-50cm higher than the pile top during construction. The construction process method of using a deep slope protection pile layer slope protection pile machine to sink and cut soil three times, and to lift, mix, and spray grout twice to form a pile. Construction technical requirements:
1.水泥土護坡樁:鉆孔直徑700mm,孔中心距為500mm,樁身采用PO42.5普通硅酸鹽水泥,水泥摻量為16%,水灰比采用0.5~0.55。水泥土護坡樁養護期不得少于28天,無側限抗壓強度qu>0.8Mpa時方可開挖基坑。具體施工要求按施工圖紙進行。
1. Cement soil slope protection pile: The drilling diameter is 700mm, and the center distance between the holes is 500mm. The pile body is made of PO42.5 ordinary Portland cement, with a cement content of 16% and a water cement ratio of 0.5-0.55. The curing period of cement soil slope protection piles shall not be less than 28 days, and excavation of foundation pits can only be carried out when the unconfined compressive strength qu>0.8Mpa. The specific construction requirements shall be carried out according to the construction drawings.
2.樁體垂直度偏差不得大于0.5%L,樁位偏差不得大于50mm。
2. The verticality deviation of the pile body shall not exceed 0.5% L, and the pile position deviation shall not exceed 50mm.
3.雙軸護坡樁為坑內土體加固,一幅樁的搭接為20cm。
3. The biaxial slope protection pile is used to reinforce the soil in the pit, and the overlap of one pile is 20cm.
山東護坡樁
4.采用兩次注漿三次攪拌工藝:攪拌頭下沉攪拌設計深度,然后提噴漿升設計標高,重復以上工序。攪拌頭平均下沉及提升速度不得大于0.5m/min,速度必須均勻,每根樁的注漿量必須足夠。
4. Adopt two rounds of grouting and three rounds of mixing process: first, the mixing head sinks and mixes to the design depth, then lift the spray to the design elevation, and repeat the above process. The average sinking and lifting speed of the mixing head must not exceed 0.5m/min, and the speed must be uniform. The grouting amount for each pile must be sufficient.
5.水泥土護坡樁應連續施工,不可長時間中斷,樁組之間搭接時間不得大于24小時,如超過24小時,須采取措施對其施工冷縫進行處理(增加一根樁),搭接樁水泥的摻量為18%,在接逢外補樁及作出明顯標記。
5. Cement soil slope protection piles should be constructed continuously and should not be interrupted for a long time. The overlap time between pile groups should not exceed 24 hours. If it exceeds 24 hours, measures must be taken to treat the construction cold joint (adding one pile). The cement content of the overlap pile is 18%, and piles should be added and clearly marked outside the joint.
6.水泥漿制備后應在2小時內用完,并防止水泥漿發生離析,拌漿桶和拌漿池內均設置攪拌裝置。水泥要有質量保證單,并應取樣復試合格后方可使用,不同品種、標號、生產廠家的水泥不能混用于同一根樁內。
6. After the preparation of cement slurry, it should be used up within 2 hours to prevent segregation of the cement slurry. Mixing devices should be installed in the mixing bucket and mixing tank. Cement must have a quality assurance certificate and must be sampled and retested before use. Cement of different varieties, grades, and manufacturers cannot be mixed in the same pile.
7.應設專人對每根樁的水泥摻量、攪拌情況和施工情況做詳細的記錄。
7. A dedicated person should be assigned to keep detailed records of the cement content, mixing situation, and construction situation of each pile.
護坡樁在工程中的應用相關內容就到這里了,您對此有怎樣的疑惑或者需求,就來我們網站http://www.frozen-food.com.cn咨詢!
That's all for the application of slope protection piles in engineering. If you have any doubts or needs about this, please come to our website http://www.frozen-food.com.cn consulting service

聯系
客服

13953119885
客服服務熱線

微信
溝通

掃碼微信溝通
頂部
X

截屏,微信識別二維碼